Design-Build
Collaborative Delivery and You
How to Decide Which Method is Best for Your PFAS Treatment Project By Andy Sterling Over the past decade, Collaborative…
Balancing the Risks & Rewards of Underground and Trenchless Delivery Methods
By Steve Kramer Too few bidders. Bids above engineer’s estimates. Labor shortages. Material shortages and price increases. Delays in design…
Kentucky collection system project wins national design-build award
A Kentucky-based sewer collection system improvement project has been heralded by the Design-Build Institute of America (DBIA) during its 2019…
Reducing Risk with Design-Build
A design-build contractor is often in the best position to manage a project, so it should be assigned as much…
Houston, San Jose Select CH2M as Design-Build Partner
The City of Houston, Texas, and the City of San Jose, Calif., each selected CH2M as its design-build partner for…
A Look at Progressive Design-Build in the Water Sector
Design-build has been adopted by the water/wastewater industry at a fast and furious pace. Owners are not only impressed by the speed at which their projects are being delivered, but they enjoy contracting with highly-qualified design and construction teams that place a high value on innovation, quality and client relations.


